Network planning | Gopa Intec

Uganda - Karuma Interconnection Project (Kawanda 400 kV, Karuma - Lira 132 kV Transmission Lines and Associated Substations) The Government of Uganda has launched a number of major projects in the energy sector, among which is the construction of the Karuma Hydropower Project (600 MW) on the Nile River, expected for commissioning in 2018.Get price

transformers Gas Insulated Substations products factory-sell

transformers Gas Insulated Substations products factory-sell-directly. WEG enters the GIS (Gas Insulated Substation) market Gas Insulated Substations (GIS), the equipment and busbars are installed inside pressurized tanks by Sulfr hexafluoride gas (sulfur hexafluoride), which due to its insulating properties, provide a significant reduction in equipment dimensions and mainly a drastic reduction in theGet price

gis underground substation Analysis

Study of gas insulated substation and its comparison with· Also, the compactness of GIS helps in integrating it in places like in the basement of an existing building or an underground of a park. Fig. 3 depicts use of ABB gas-insulated switchgear allowed the 132-kV transformer substation Barbaña in the centre of Orense, Spain, to be constructed underground and a park built over it whichGet price

sf 6 INSULATED SWITCHGEAR factory-sell-directly

sf 6 INSULATED SWITCHGEAR factory-sell-directly. With this project, a gas-insulated switchgear with vacuum interruption systems and clean air technology for a voltage of up to 145 kV is being delivered for the first time in the world. sf 6-free circuit-breakers and GIS are a further development of the switching and insulation using insulating gas, which...Get price

Catherine Nyakecho - Geologist - Department of Geological

Uganda, Karuma Interconnection Project (Transmission Lines and Substations) Karuma Interconnection Project comprises 400kV and 132kV transmission networks which will evacuate the energy produced by the 600MW Karuma Hydropower Plant to various load centres which include Karuma, Lira and Olwiyo in the north and Kawanda (Kampala) in central Uganda.Get price

Karuma–Kawanda High Voltage Power Line - Wikipedia

The 400 kilo Volt power line starts at the 400kV substation a Karuma Hydroelectric Power Station, Kiryandongo District, in UgandaWestern Region, approximately 260 kilometres (162 mi), by road, north of Kampala, the capital and largest city in the country. The power line travels in a general south-easterly direction to end at another 440kV substation owned by Uganda Electricity Transmission Company Limited (UETCL), located at Kawanda, in Wakiso District, a total distance of about 264Get price

Projects filtered | Gopa Intec

The present project covers Package-III: Short- and Medium-Term Project (Substation and Transmission), which includes the upgrading of 11 existing substations (7.5/15/33/45 kV), the construction of one new 132/33/15 kV GIS substation, and the construction of a number of 132 kV double-circuit overhead lines, 33 kV feeder lines, and 132 kVGet price

Narc-consulting , Narc consulting pvt ltd

SNo. Name of assignment Client Country/State; 1: Detailed Design Engineering for Power Evacuation System for 570 MW Upper Marsyangdi - 2 Hydro Electric Power Project in Nepal-400 KV D/C Transmission Line with associated substations within India Nepal-interconnection options included.Get price

gis underground substation Analysis factorys

gis underground substation Analysis factorys. Design Analysis of 220/132 KV Substation Using ETAP· PDF fileof single line diagram of 220 kV substation in ETAP based upon practical data. Section 4 is the Load Flow Analysis of the substation. Section 5 contains the Alert summary report generated after load flow analysis.Get price

New substation to stabilize power supply in Nairobi

May 28, 2018 · Energy Cabinet Secretary Hon. Charles Keter has Monday commissioned the 220/66kV Gas Insulated Switchgear (GIS) substation located at the city centre.Get price

Network Reliability Analysis as a Tool to Guide Investment

This paper analyzed the decision by Emerging Power Uganda to locate the investment in the 15 MW solar power station in a particular location using a given evacuation line. Based on the results presented for all the reliability indices, it is clear that the selected Jinja Industrial-Iganga 33 kV line was not the best option for this evacuation.Get price

TRANSMISSION MASTER PLAN FOR RWANDA

• All Power Substations in Rwanda must have n-1 supply (at least two evacuation options). • Evacuation of Generation must be able at n-1 conditions (at least two evacuation options). • All new transmission lines are constructed to allow for two circuits (allow for future growth –use same corridor and structures).Get price

Satconengg - Engineering Consultant, Substation Design

EHV Substation Design having outdoor Switchyards upto 400kV. EHV GIS Substations upto 400kV. EHV Transmission Lines upto 400kV. HV / MV / LV Power Receiving and Distribution systems upto 220kV for Large Industries like Steel Plants, Refineries etc. EHV Power Evacuation systems of Large Thermal Power Plants.Get price

Global Transmission Report : Middle East Africa News

Nov 24, 2020 · Uganda is constructing various high voltage transmission lines and substations for evacuating power from several upcoming new hydro power plants (HPPs), and thus improving access to electricity. Kuwait’s MEW awards five-year substation maintenance service contract to Siemens November 25, 2020Get price

Transmission

220 kV Transmission line to evacuate power from Rusumo Regional Hydro Power Plant linking Rusumo, Bugesera and Shango at a distance of 119 km. It is expected to be completed in 2019. 220 kV Transmission line evacuating power from the Western parts of Rwanda from Karongi, Kigoma to Rwabusoro at a distance of 74km. It is expected to be completedGet price

Vaibhav Sahu, MIE, CEng. - Head of Construction - Solar

1. 765 kV 400 kV AIS Substation - Sasan UMPP India 4000 MW 2. 400 kV GIS substation Samalkot, CCGT 2400 MW 3. 220 kV, AIS Substation Tanzania, Kinyerezi 2, 240 MW, TANESCO 4. 161, GIS, Ghana, Accra, Hitachi. ActivityGet price

Reference Shanghai Tower - Siemens Global Website | Ingenuity

Sustainable Energy A tower for the 21st century Siemens is helping Shanghai Tower to build the most advanced intelligent energy system. With its extraordinary performance in high efficiency and saving energy, Shanghai Tower has received a LEED Platinum certificate for green building design.Get price

ABB delivers substation to enable power flow from solar park

Feb 14, 2017 · ABB has successfully energized a major substation that will help evacuate power from the Mohamed Bin Rashid Al Maktoum (MBR) Solar Park, a key element of the vision to generate 7 percent of Dubaipower from clean energy sources by 2020; 25 percent by 2030, and 75 percent by 2050. The 400/132 kilovolt (kV) gas-insulated switchgear (GIS) substation has been built for Dubai Electricity Water Authority (DEWA), the UAEleading power utility, to connect the second phase of the MBR Solar ParkGet price

is funded by the European Bank for Reconstruction and

The Common Transmission System for Phase-II Generation Projects in Odisha and the Immediate Evacuation System for OPGC [1,320 MW] Project, is one of eight key power transmission projects put up for rate-based competitive bidding The project involves the construction of the 350 km long, 765 kV Jharsuguda (Sundargarh)–Raipur Pool double-circuit transmission line and the 50 km long, 400 kV OPGC– Jharsuguda (Sundargarh) double-circuit transmission line.Get price

Capacity development and Environmental governance | Gopa Intec

Measures identified for Phase II include the rehabilitation of a 400/132/11 kV, 4 x 250 MV GIS substation, the construction of two new 132/33 kV, 3 x 63 MVA GIS substations, the construction of two new 33/11 kV, 3 x 31.5 MVA distribution substations and the construction of 154 km new double circuit transmission line.Get price

Vaibhav Sahu, MIE, CEng. - Head of Construction - WElink

- GIS substation, 161 kV, Ghana, Accara Senior Management responsibility for offices in Tanzania, Rwanda, Uganda, Mozambique, Mauritius and a multicultural workforce in excess of 500 personnel.Get price

Ashish Bhan, CEng MIET, PMP - Engineering Specialist - GE

500kV 1500MW BiPolar HVDC Substation - KAPES - Transfer of Competence Training (Layout) (800 hrs) Below Ground Farthing Design using CDEGS MALZ - Battery Storage Projects, HV Filters, Conventional AIS and GIS Substations. Primary Design Verification - National Grid Projects.Get price