High-voltage systems for substations | Portfolio | Siemens

With almost 50 years of GIS manufacturing experience and the largest installed base of GIS, Siemens Energy is able to provide GIS solutions that even comprise operational training. More than 34,500 Siemens Energy GIS bays are currently in operation in GIS substations all over the world – even in most challenging environments.Get price

Final milestone for Shetland HVDC link complete - SSE

Aug 03, 2020 · “Siemens /BAM are delighted to be delivering the Kergord 132kV GIS substation through the well-established Siemens/BAM JV which has worked extensively across the network with the SSEN Transmission team The project will use Siemens Energy’s world leading and innovative environmentally friendly gas insulated switchgear, which enables climate-neutral, reliable power transmission, free of harmful greenhouse gases, supporting SSEN Transmission’s commitment to reduce its own greenhouse gasGet price

Substations New GIS substation for Sloy - ABB

New GIS substation for Sloy. Substations. ABB’s engineering team based in East Kilbride is managing the construction of a new substation for Scotland’s most powerful hydroelectric facility in readiness for a new pumping station designed to blend in with the plant’s setting in the Loch Lomond and Trossachs National Park. The need Scottish Southern Energy (SSE), which operates the 152.5 MW facility at Sloy, is building a new pumping station, which will enable it to pump water up fromGet price

A Better World of Energy | SSE Renewables

SSE Renewables provides energy needed today and is building a better world of energy for tomorrow through the world class operation, development and construction of renewable energy assets. We’re part of FTSE-100 company, SSE plc.Get price

Kintore 400kV Substation

SSEN Transmission welcomes the approval of the Kintore substation by Aberdeenshire Council, which once constructed, will be the world’s first 400kV Green Gas for Grid (g3) substation. The new, innovative clean gas technology will result in a reduction of emissions equivalent to removing 138,000 cars from our roads for one year when compared to traditional substation gas technology.Get price

PSEG Orders GIS for Substations | TD World

Nov 13, 2015 · The substations are part of PSEG’s program to protect and strengthen utility substations against increasingly frequent severe weather occurrences and enable reliable and resilient energy delivery. Hillsdale substation in Bergen County is a 50-year-old air-insulated switchgear (AIS) facility that will be upgraded to protect the infrastructure and prevent power outages for residents during severe weather.Get price

Gas-Insulated Substations : GE Grid Solutions

Gas-Insulated Solutions. GE designs, manufactures, installs and services a full range of state-of-the-art Gas-Insulated Substations (GIS) for utilities and industries worldwide. The portfolio includes GIS solutions from 60 to 800 kV, along with hybrid, mobile and digital GIS solutions, Gas-Insulated lines and other secondary products to maximize switchgear and network operation, including spring-operated mechanisms for AIS, GIS and generator circuit breakers.Get price

SSE - caulstown-platin-substation.com

SSE is proposing a 208MW peaker power generation plant at Platin, Co. Meath. The purpose of this proposed development is to provide necessary backup electricity generation at times when electricity demand exceeds available supply, typically when renewable generation is low.Get price

SSEN Distribution | SSE

Scottish and Southern Electricity Networks (SSEN) Distribution is responsible for ensuring a safe and reliable supply of electricity to 3.8 million customers in communities across its network.Get price

Peterhead Substation - SSEN Transmission

About the project. Scottish and Southern Electricity Networks (SSEN), operating as Scottish Hydro Electric Transmission plc (SHET) under licence has plans to construct a new 400/275kV substation adjacent an existing substation in Peterhead. SHET previously consulted on proposals for a new substation at Peterhead in 2013, however due to the changing requirements in the transmission network, SHET has undertaken further system and technical analysis to ensure that our proposals meet the futureGet price

Electrical substation work | Power Systems Design Solutions Ltd

To establish the 33kV cable connections to the Alcan plant from SSE Fort William 33kV substation, the requirement was needed to reconfigure the circuits at Fort William and this required existing circuit designs and interface engineering to be modified and to provide drawings highlighting to show the required site modifications.Get price

U. S. Electric Grid, Substations Power Plants GIS Data | Rextag

U. S. Electric Grid, Substations Power Plants GIS Data. Request Data Demo! The electricity dataset covers all of the United States with 4 different data layers.. Electricity Power linesGet price

Work in Substations - General - TransGrid

Work within Substation Buildings and Car Parks (Cat 3.1) Work in Switchyards and High Voltage Areas not affecting Substation Apparatus (Cat 3.2) Work in Switchyards or High Voltage Areas affecting Substation Apparatus (Cat 3.3) 2.1 Personal Protective Equipment (PPE) All persons shall observe the additional PPE requirements for work on site.Get price

5 Differences Between Air-Insulated Substations and Gas

ConstructionInstallationOperationMaintenanceTotal Cost of OwnershipGIS high voltage substationengineering uses the gas sulfur hexafluoride for insulation, whereas AIS uses air insulation in a metal-clad system. Sulfur hexafluoride is five times heavier than air and offers excellent extinction behavior. Another significant construction-based difference between the two switchyards is that a metal-clad AIS uses three-position draw-out circuit breakers (on, off and test). GIS systems use fixed, mounted circuit breakers. The sealed mounted breakers are a ‘sealed-for-life’ technology, whereas the AIS breaker can be removed for maintenance and troubleshooting.Get price

High-voltage substations in the United Kingdom - Wikipedia

Some substations in urban areas were installed in enclosed structures but the majority were in the open. The appearance of substations, and their visual impact, was improved using earth mounds and trees. Between 1968 and 1973, 725,000 tall trees, 915,400 smaller trees and 17,600 ground cover plants had been used to screen substations.Get price

Smallworld GIS - Geospatial Asset Management | GE Digital

Learn how to model, manage and accelerate the value of your connected network with Smallworld GIS - Geospatial Asset Management solutions from GE Digital.Get price

Medium Voltage blue GIS | Systems | Siemens Global

8DJH 12 – blue GIS for sustainable substation BKK Nett AS in Bergen, one of the most innovative Utilities in Norway, had a clear goal for a new MV switchgear for distribution substation: A compact ring main unit that would operate more sustainably, reliably and economically and could work at very low operation temperatures.Get price

Designing of HV Power Substation and Layout

ContentIntroductionEarthing and BondingSubstation Earthing Calculation MethodologyLayout of SubstationDifferent Layouts For SubstationsPrinciple of Substation LayoutsComponents of A SubstationIntroductionEarthing and BondingSubstation Earthing Calculation Methodology (Earthing Materials)Layout of SubstationSee full list on electrical-engineering-portal.comGet price

Planning Report - SSE

SSE has also commissioned one of Ireland’s cleanest and most efficient power plants – the 464MW CCGT power station at Great Island, Co. Wexford - which generates enough energy to power over half a million homes. SSE’s retail arm in Ireland, SSE Airtricity, is the second largest energy supplier onGet price

PGE Phases Out Sulfr hexafluoride in HV Substation GIS | TD World

Jan 27, 2020 · The utility’s first purchase of a dry-air/vacuum GIS was for its Evolution substation at the Livermore, California, U.S., training center. Most recently, the utility purchased a second dry-air/vacuum GIS for a 115-kV, 50-kA, 3000-A multi-bay GIS at its new Hunters Point substation.Get price

United States - Maps - U.S. Energy Information - EIA

Petroleum prices, supply and demand information from the Energy Information Administration - EIA - Official Energy Statistics from the U.S. GovernmentGet price

Seabank Power Station - Wikipedia

Seabank 2 (385 MW) was started in January 1999 and was completed in January 2001. The station has a number of step up transformers that allow connection to the National Grid high voltage electricity transmission system via the Seabank 400 kV GIS substation. The power plant provides enough electricity for approximately 1.6 million people.Get price

Federal Antimonopoly Service of the Russian Federation (FAS)

Company Federal Antimonopoly Service of the Russian Federation (FAS), History, Appointment of Maxim Shaskolsky as head of the FAS, The curator of IT and telecom Anatoly Golomolzin quit the FAS, 2019 FAS fined Johnson Johnson 200 thousand rubles, 2018 The new deputy head of the FAS - Mikhail Evraev, IT Incidents, 2021 FAS opened a case against Yandex, FAS recognized VimpelCom, MTS and Tele2 asGet price

Olu Adeniyi - Major Projects Connections Principal Design

Additionally, in my role with power distribution network operators, I have fulfilled the duties of Principal Designer in planning, managing, monitoring and coordinating health and safety requirements of CDM Regulations 2015 in the design and construction of 11kV primary, 33kV distribution and 132kV outdoor/GIS grid substations.Get price

Gis substation - SlideShare

Jul 12, 2014 · Comparison of GIS and AIS substation 11. Drawbacks of GIS 12. Growth of GIS substation 13. Future trends in GIS 14. Conclusion Contents 3. Introduction and governing standard This presentation covers the technical requirements and design aspects of a gas-insulated substation (GIS) as per governing standards of GIS substations.Get price

Construction of 33/11Kv GIS Substations (2 x 31.5 MVA

Construction of 33/11Kv GIS Substations (2 x 31.5 MVA) Section (1) TECHNICAL SPECIFICATION D-01C Jan 2016. 2 1.8.14 Plant 1.8.15 Concrete Strength RequirementsGet price

Giedrius Matavicius – Lead Engineer – GE Renewable Energy

110kV GIS Core and Main substation 110/35kV 51 substation. Lead Engineer/Team Leader Alstom Grid Jan. 2010 – Power Plant Operator at Ormat Technologies, Inc.Get price

(PDF) REDEVELOPING THE MOSCOW EXHIBITION CENTER (VDNH). | MS

Download. REDEVELOPING THE MOSCOW EXHIBITION CENTER (VDNH). M. Saeed. REDEVELOPMENT of VDNH TERRITORY ISOCARP Young Planning Professionals National School Moscow | Russia | 8TH – 13RD DECEMBER 2014 f The team 24 participants 11 international from 11 countries 13 Russians: 7 from Moscow, 6 from other Russian cities TEAM GOALS PROCESS METHODSGet price

Gas Switchyards Substations | EPC Contract Services

Switchyards and substations are important components of this system. A switching substation, or switchyard, is a substation without transformers that operates only at a single voltage level. Switchyards, used mainly for connections and interconnections, are essential for transmission, distribution, collection, and controlling the flow ofGet price